User Tools

Site Tools


content:meshextender:2ng

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
content:meshextender:2ng [16/03/2017 19:25]
Paul Gardner-Stephen [Power/Utility Cable]
content:meshextender:2ng [02/04/2018 20:37] (current)
Paul Gardner-Stephen [Quality Control and Testing]
Line 80: Line 80:
 See [[content:meshextender:me2.0_quality_assurance|quality assurance]] for details on testing the cable, and programming the integrated I2C EEPROM. See [[content:meshextender:me2.0_quality_assurance|quality assurance]] for details on testing the cable, and programming the integrated I2C EEPROM.
  
 +==== Mesh of Things (MoT) / Utility Connector ====
 +
 +[[content:meshextender:me2.0_utility_connector_pinout]]
  
 ==== Bill of Materials ==== ==== Bill of Materials ====
Line 85: Line 88:
 [[content:meshextender:me2.0_bill_of_materials|Bill of Materials]] [[content:meshextender:me2.0_bill_of_materials|Bill of Materials]]
  
-==== Quality Control and Testing ====+==== Provisioning, Quality Control and Testing ====
  
 We need to establish quality control, programming, test, qualification and certification procedures for the Mesh Extender units.  To be confirmed. We need to establish quality control, programming, test, qualification and certification procedures for the Mesh Extender units.  To be confirmed.
content/meshextender/2ng.1489717505.txt.gz · Last modified: 16/03/2017 19:25 by Paul Gardner-Stephen