Differences

This shows you the differences between two versions of the page.

Link to this comparison view

content:meshextender:2ng [17/08/2017 16:11]
Ryan Mounce
content:meshextender:2ng [03/04/2018 13:07] (current)
Paul Gardner-Stephen [Quality Control and Testing]
Line 88: Line 88:
 [[content:meshextender:me2.0_bill_of_materials|Bill of Materials]] [[content:meshextender:me2.0_bill_of_materials|Bill of Materials]]
  
-==== Quality Control and Testing ====+==== Provisioning, Quality Control and Testing ====
  
 We need to establish quality control, programming, test, qualification and certification procedures for the Mesh Extender units.  To be confirmed. We need to establish quality control, programming, test, qualification and certification procedures for the Mesh Extender units.  To be confirmed.

Login